저희는 중국에 본사를 둔 선도적인 유리 제조업체로,
산업 및 건축 분야를 위한 고품질 유리 솔루션을 전문으로 합니다.
다년간의 경험과 ISO 인증을 바탕으로, 전 세계의 조달 전문가, 엔지니어 및 프로젝트 관리자에게 신속하고 맞춤형 견적과 신속한 지원을 제공합니다.
Provide finished panel dimensions with units, quantity, shape, and acceptable tolerances. Identify whether measurements describe the opening or the required finished piece; installation clearances must be resolved before fabrication.
Include:
Dimensions alone cannot determine an appropriate specification. A shelf, door, and tabletop may need different designs despite similar sizes. Confirm available dimensions and fabrication limits for the proposed configuration. If thickness remains undecided, flag it as unresolved before order approval.
Agree who supplies final measurements and who approves drawings, especially when a contractor coordinates several panel sizes.
Evaluate the proposed order against written evidence. Ask which fabrication operations are available and whether the specified sizes, tolerances, finishes, and hardware preparation can be achieved together.
Before ordering, confirm:
Product compliance documents relate to the specified material or assembly; company certification serves a different purpose. Check what each document actually covers. Confirm any installation responsibilities separately, along with the agreed scope of supply.
Send the following information so the quotation can describe the intended order clearly:
Missing information can be identified as provisional, but resolve it before authorizing fabrication. For a replacement, provide the required finished measurements and hardware details; photographs help explain the setting but do not replace dimensions.
Specification complexity, material availability, packaging, and transport requirements can affect pricing and scheduling. Ask what the quotation includes, its validity, and when any proposed delivery date becomes confirmed. Check amendment and cancellation terms before approving the order.
| 애플리케이션 | Details to resolve before ordering |
|---|---|
| Glass doors | Hardware model, fixing preparation, opening direction, and clearances. |
| Shower doors | Hinge and handle positions, enclosure layout, and applicable requirements. |
| Glass shelves | Support spacing, loading, exposed finishes, and corner details. |
| Tabletops | Base contact points, overhang, finished dimensions, and exposed perimeter. |
| 유리 유형 | Treatment or construction | General fracture behavior and retention | Purchasing implication |
|---|---|---|---|
| 템퍼링 | Thermally strengthened | Small fragments can fall out; no bonded retention in a monolithic panel. | Confirm application requirements and consequences of an opening after fracture. |
| 접합 유리 | Multiple glass layers bonded with an interlayer | Fragments generally adhere to the bonded layer; retention depends on the assembly. | Specify the full build-up and required post-fracture performance. |
| Annealed glass | Without additional strengthening treatment | Larger, sharp pieces; no inherent bonded retention. | Check whether the application requires a different construction. |
| Heat-strengthened | A distinct thermal treatment | Larger, sharp pieces; no inherent bonded retention. | Does not qualify as safety glass by itself. |